HOME | CAREERS | COMPANY | PRODUCTS | SERVICES | TRAINING | SUPPORT | PARTNERS | LIBRARY | TRY | BUY | Contact Us |

:: Free software demos

:: Technical papers

:: Step by step strategy

:: Cybectec Enterprise Solutions

:: SMP Substation Gateway

:: Visual SubstationTM

:: Case studies

:: Training

:: Security

 

Home > Library

Library

Download trial software, technical documents and product literature from our library.

All documents are provided as PDF files in Adobe Acrobat format. If you do not have it, you can get the Acrobat Reader free of charge from Adobe.

Click here to download the free Adobe reader

Download Free Software Trial Versions

Click here to download free OPC software trial versions

Technical Papers

NERC CIP: "An increasing number of sophisticated electronic devices are finding their way to the substation. Utilities are just beginning to appreciate the value of the information these Intelligent Electronic Devices (IED) can provide. However, many of these IEDs must now be considered critical cyber-assets and must be secured in compliance with NERC CIP-002-1 through CIP-009-1 Cyber Security Standards. This article discusses strategies now being implemented by major utilities in order to achieve the benefits of IED integration, while meeting NERC Cyber Security Standards."
Making the most out of substation IEDs in a secure, NERC compliant manner

Pilot Projects: "Most utilities are faced with the daunting task of integrating new devices with their existing RTUs and SCADA. To provide this type of capability, automation systems now require sophisticated communications infrastructure to connect the substation devices to the various control centers. Because of the complexity of this task, we propose a common-sense approach to pilot projects that has been used successfully to minimize the risks and costs in a large number of substation automation projects."
Planning Your Pilot Project, Part I.

Redundancy Options: "As the SMP is a central element in the substation it offers several different options to create redundant solutions. This document will outline the redundant options one by one. The usage will be described with diagrams as much as possible. At the end use cases will be presented to show how combinations of redundant options can be used to create reliable communication systems."
Redundancy options with the SMP


WPDAC 2007

How to Integrate NERC CIP Requirements in an Ongoing Project: Presented by Jacques Benoit at Western Power Delivery Automation Conference 2007. Presentation - Paper

A Case Study: How a utility Automated and Integrated Automated and Integrated Data/Control Data/Control for 4000 Pole for 4000 Pole-Top Top Switches and Protection Relays, Switches and Protection Relays, and Reduced its SAIDI, presented by Robert O'Reilly at Western Power Delivery Automation Conference 2007. Presentation - Paper


DistribuTECH 2008

Hidden Challenges in the Implementation of 61850 in Larger Substation Automation Projects, presented by Robert O’Reilly at DistribuTECH 2008, paper


DistribuTECH 2007

Optimizing Substation Automation by Using IED Data in an Intelligent Gateway, presented by Gerrit Dogger at DistribuTECH 2007, paper

Using IED Data To Implement Substation Automation Functions, presented by Gerrit Dogger at DistribuTECH 2007, presentation


DsitribuTECH 2006

Making the most out of substation IEDs in a secure, NERC compliant manner, Jacques Benoit, Jean-Louis Pâquet, présented at DistribuTECH 2006 Conference and Exhibition, Tampa, FL, février 2006.


OSIsoft PI T&D Users Group Meeting 2005

A new power-generation monitoring system for Hydro-Quebec, Alexandre Trottier-Lapointe, Eng., presented before the OSIsoft PI T&D Users Group Meeting, Providence, RI, September 2005. (7MB)


WPDAC 2004

Strategies for Automating the Retrieval and the Management of Non-Operational Substation Data, Jean-Louis Paquet, Anthony Wright, presented before the 6th Annual Western Power Delivery Automation Conference Spokane, Washington, April 2004. (379KB)


Substation Equipment Diagnostics Conference 2004

Expert System Development and Integration with MoniTeq Circuit Breaker Monitoring, R. Schwabe, Yvan Pinard, Eric Vermette, presented before the Substation Equipment Diagnostics Conference, New Orleans, February 2004. (841KB)


Cybectec's Step By Step Strategy

Step By Step Substation Automation, Integration and Modernization, product flyer (551KB)

Step by Step Substation Modernization Using the SMP Gateway, white paper (392KB)
 

Cybectec Enterprise Solutions

Cybectec Enterprise Solutions, product flyer (584KB)
Cybectec Security Server, product flyer (76KB)
Enterprise Event Manager, product flyer (95KB)
Enterprise Passthrough Manager, product flyer (80KB)


SMP Intelligent Substation Gateways

Cybectec SMP Products, product flyer, includes SMP 4, SMP 16/CP, SMP 16/SG, SMP 16/SP, SMP Annunciator, Ethernet Switch (1.5MB) New! Now available in Spanish (1.5MB)

SMP Gateway Characteristics, detailed technical specifications (363KB)

The SMP Gateway, A Technical Introduction, white paper (852KB)
New: SMP 16/SP, product flyer (348KB)
SMP I/O: For Today’s Substations, product flyer
SMP I/O, datasheet (825KB)
 


Visual SubstationTM

Visual Substation, product flyer (1.85MB)


Case Studies

AIL Switzerland IEC 61850 Implementation

Alstom Power (99KB)

Breton, Banville & Associates (56KB)

GTC Automates Substation IEDs and Improves the Flow of Information (209KB)

GTC Upgrades Its Communications and Reduces SAIDI and SAIFI (249KB)

Hydro-Québec Distribution Automation Project (101KB)

Hydro-Québec EMS Modernization Project (200KB)

Hydro-Québec Load Shedder (208KB)

Hydro-Québec Shunt Reactor Control (202KB)

Hydro-Québec RTU Modernization Project (247KB)

Hydro One Networks (310KB)

Interconexion Eléctrica de Colombia ISA (74KB)

Los Angeles Department of Water and Power (407KB)

Newfoundland Power (238KB)

New York Power Authority Real-Time Circuit Breaker Condition Monitoring System (102KB)

Siemens - CNOOC and Shell Nanhai Petrochemical Project (252KB)
Summerland Power Upgrades its IEDs and Reduces Visits to the Substation (323KB)

Tyco Electronics (98KB)
Vattenfall (233KB)
Venetia Diamond Mine (123KB)
 


Training

SMP Gateway - Using the SMP Gateway (39KB)

SMP Gateway - Using the automation functions (40KB)

Protocol training - Using the DNP3 Protocol with the SMP Gateway (36KB)

Protocol training - DNP3 (37KB)


Security

Helping Utilities Comply With NERC CIP, flyer (227KB)

 

Securing Critical Cyber Assets with Cybectec Products

 

NERC CIP-002-1 through CIP-009-1

Cyber Security Standards (formerly 1300)

http://www.nerc.com/%7Efilez/standards/Cyber-Security-Permanent.html

NISCC Good Practice Guide on Firewall Deployment for SCADA and Process Control Networks

http://www.niscc.gov.uk/niscc/docs/re-20050223-00157.pdf

Computer Security Resource Center Library

http://csrc.nist.gov/publications/

21 Steps to Improve Cyber Security of SCADA Networks,

U.S. Department of Energy, Office of Energy Assurance (2.52MB)

Copyright © 2008 Cooper Power Systems, all rights reserved.